# PUDL ID Mapping

## The Status of FERC 1 and EIA IDs

Many of the same utilities are reporting data to FERC and EIA, but there is no official
crosswalk file or universal ID to connect the records and obtain information from both
sources in one table. The EIA assigns their own IDs to distinguish the utilities and
plants that report to them over time. These IDs are useful for parsing EIA data, but
they are not connected to utility and plant data reported by FERC. FERC Form 1 uses a
respondent ID to keep track of utilities, but it does not have an ID system in place to
keep track of unique plants or records over time.

Why is this significant? Without plant IDs, you can’t track plant characteristics over
time. Without shared plant IDs, you can’t develop a holistic understanding of individual
plants based on the data they report to different entities. Linking the financial
information from FERC 1 with the operational data from EIA923 and EIA860 for instance
helps us cultivate a more complete picture of the marginal cost of electricity.

## PUDL IDs

To make the data from FERC 1 and EIA more usable and interchangeable, we have developed
universal `plant_id_pudl` and `utility_id_pudl` values that are the same across
datasets. The plant IDs are assigned via a manual mapping process that is codified in a
spreadsheet located at `pudl/package_data/glue/pudl_id_mapping.xlsx`. The utility IDs
are assigned in a CSV located at `pudl/package_data/glue/utility_id_pudl.csv`.
These maps contain all unique plant and utility names reported to FERC and EIA from the
oldest to the newest year of data we’ve collected for each data source.

We assign plant and utility PUDL IDs to each record first by giving each record a
unique ID and then by identifying and fixing records that should share an ID. See below
for more detailed instructions.

Plants, as defined by this mapping process, are considered co-located generation assets.
Records that have the same `plant_id_eia` should also have the same `plant_id_pudl`.

#### WARNING
PUDL IDs should **never** be hard-coded into any analysis or transformation functions as
they may come to represent different plants or utilities as new records are added
and mapped.

PUDL IDs are not static. They identify unique plants/utilities in a given iteration of
the data, but they may not remain exactly the same over time. The spreadsheet assigns
`plant_id_pudl`’s based on a record’s position in the spreadsheet, so if you change
the PUDL ID of a record in the middle, it will change the PUDL ID of all those below it
(unless they are referencing a PUDL ID that already exists).

#### WARNING
No more than one person should ever update the PUDL ID mapping spreadsheet at a
time. Two people updating PUDL IDs simultaneously will lead to discrepancies in the
PUDL ID values.

The [`pudl.glue.ferc1_eia`](../autoapi/pudl/glue/ferc1_eia/index.md#module-pudl.glue.ferc1_eia) module is where most of the ID coordination happens
after the records are manually mapped. It also contains the functions that determine
whether plants/utilities have or haven’t been mapped.

## FERC1 Utility IDs

The FERC1 data source is actually a nesting doll of two data sources. Before 2021, the
FERC1 was reported as a FoxPro database DBF. 2021 and on, FERC1 is reported in XBRL
files. The DBF and XBRL data do not share IDs for the reporting utilities. DBF reports
utility respondents with `respondent_id`’s while XBRL reports utility respondents
with `entity_id`’s, which we rename to `utility_id_ferc1_dbf` and
`utility_id_ferc1_xbrl`. We needed a way to link these disparate IDs, so we created
`utility_id_ferc1`. These IDs are assigned and stored in
`pudl/package_data/glue/utility_id_ferc1.csv`.

#### WARNING
When there are new FERC1 utilities to be mapped, you will probably need to map the
utility ID’s before the tables will be able to be transformed because the
PUDL-assigned utility ID is used as a merge key.

#### WARNING
To fully map the FERC1 utilities you’ll need to run the unmapped IDs
check - documented below - twice because there are two layers of ID’s as
described above.

## Checking for Unmapped Records

With every new year of data comes the possibility of new plants and utilities. Once
you’ve integrated the new data into PUDL [(see instructions)](existing_data_updates.md), you’ll need to check for unmapped utility and plants.
There are a few options for how to do this.

The quickest way is to download and unzip the most recent nightly build version of
`pudl.sqlite` from the s3 cloud bucket and materialize the assets you modified on
top of that. Before running the local test for ID mapping, you’ll also need
`ferc1_xbrl` and `ferc1_dbf` sqlite and json files downloaded locally.

```console
# Pull fresh database from the nightly builds aws s3 bucket
$ aws s3 cp --no-sign-request s3://pudl.catalyst.coop/nightly/pudl.sqlite.zip ./
$ aws s3 cp --no-sign-request s3://pudl.catalyst.coop/nightly/ferc1_dbf_datapackage.json ./
$ aws s3 cp --no-sign-request s3://pudl.catalyst.coop/nightly/ferc1_dbf.sqlite.zip ./
$ aws s3 cp --no-sign-request s3://pudl.catalyst.coop/nightly/ferc1_xbrl_datapackage.json ./
$ aws s3 cp --no-sign-request s3://pudl.catalyst.coop/nightly/ferc1_xbrl.sqlite.zip ./

# Unzip the databases
$ unzip '*.zip'

# Materialize the assets you modified on top of the fresh database
$ pixi run dg launch --assets "group:'your_asset_group'+"
```

Once that’s all set, you can run the following test to save unmapped IDs. This invokes
a script that identifies plants and utilities which exist in the updated FERC 1 and
EIA datasets that do not yet appear in the stored ID maps.

```console
$ pixi run pytest tests/integration/glue/glue_test.py --live-pudl-output --save-unmapped-ids
```

The `--save-unmapped-ids` flag saves unmapped plants and utilities in the
`devtools/ferc1-eia-glue` folder by default.

If you don’t have access to the ETL outputs, you can also get unmapped IDs by running
the full ETL locally. The following command runs the full ETL and saves unmapped-ids.
Beware that the full ETL can take several hours to run and requires a computer with
substantial processing power. If you can avoid running the full ETL, that’s probably
best!

```console
$ pixi run unmapped-ids
```

This will generate a complete database based on the settings files stored in
`pudl/package_data/settings/etl_full.yml` without foreign-key constraints and save any
unmapped IDs to the `devtools/ferc1-eia-glue` directory that correspond to unmapped
plants and utilities from FERC 1 and EIA.

## Assigning PUDL IDs to Unmapped Records

Here comes the manually intensive part of the process! Now we must ensure that 1) every
record gets assigned a PUDL ID and 2) that records pertaining to the same plant have the
same PUDL ID.

#### WARNING
The ordering of the rows in the mapping spreadsheet is important. **YOU MUST NOT
SORT THE PUDL ID MAPPING SPREADSHEET**, as it will change the values of many
assigned IDs. If you need to view only a subset of the data in the sheet for ease of
mapping you can filter it.

### Mapping Plants

The `missing_plant_id_in_plants_ferc1/eia.csv` files should display basic plant
information such as the facility name, utility name, and capacity. We show capacity here
so that we can prioritize which plants to map. The larger the capacity, the more
important it is to get it mapped. Sort the records by capacity so the highest priority
records at the top.

From the FERC and EIA unmapped plants spreadsheets, copy the `plant_id_eia` (only in
EIA), `plant_name_ferc1/eia`, `utility_id_ferc1/eia`, and `utility_name_ferc1/eia`
columns and paste them at the bottom of the corresponding columns in the plants tab of
the `pudl_id_mapping.xlsx` spreadsheet. Next drag the auto-incrementing formula in the
`plant_id_pudl` column and the naming formula in the `plant_name_pudl` column so
that all new records are automatically assigned PUDL plant names and unique PUDL IDs.
You should also drag the `find_plant_id_eia_matches` formula down, which we’ll use in
the next step.

In previous iterations of the spreadsheet, matching FERC and EIA records were placed in
the same row with the FERC version in the FERC columns and the EIA version in the EIA
columns. This is not necessary. As long as matching FERC and EIA records (and same-plant
records within a data source) have the same PUDL ID in the `plant_id_pudl` column,
you’re good to go!

#### Linking FERC1-EIA Records

Now that all of the unmapped plants have been added to the spreadsheet and given an ID,
we need to check whether they should actually be linked to, and share PUDL IDS with,
another record. Because utilities may spell plant names differently year to year (EX:
`La Cygne` and `lacygne`) or report subcomponents of a single plant (EX: `Hancock`
and `Hancock Peaker`), it is not uncommon for multiple records to share a PUDL ID. As
mentioned above, plants with the same EIA ID should also have the same PUDL ID. The cell
formula that assigns PUDL IDs does not account for this, but there is a column,
`find_plant_id_eia_matches`, in the `pudl_id_mapping` spreadsheet that will look for
past instances of the same `plant_id_eia`. If you haven’t already, drag this formula
down so that it checks all the new records. If it finds a match, update the newer record
to have the same PUDL ID.

#### NOTE
To save time, we’re only linking plants with a capacity of 5 MW or higher. Because
you sorted the records by capacity, this should be easy. Just look at the unmapped
plants csv for the first plant under 5 MW and everything below that can remain
unlinked.

For each new record, search the `pudl_id_mapping` spreadsheet for a piece of the
plant name string (e.g. for `chenango solar`, you could search for `chen`,
or `chenan`). If the new records you’re mapping come from FERC, look for matches
in the `plant_name_eia` column (and vice versa for EIA). Searching
for a piece can help catch misspellings in the plant name, which are more common
in the FERC records. You can also use the `devtools/pudl_id_mapping_help.ipynb`
notebook to speed up this process.

* **If co-located EIA plants have distinct EIA plant IDs and no FERC 1 plant:**
  they should *not* be lumped under a single PUDL Plant ID, as that artificially reduces
  the granularity of data without providing any additional linkage to other datasets.
* **If a record has the same plant and utility name as another record:**
  assign it the same PUDL ID as the other record **by reference** to the cell in which
  the first instance of that PUDL ID appears. **Never simply enter the PUDL ID as a
  number**, as it will not update automatically when IDs change due to re-mapping or
  other alterations. If the new plant name is similar in that it’s a different unit or a
  part of a facility that uses a different fuel type (e.g.  `Conemaugh (Steam)` and
  `Conemaugh (CT)`, they should still share the same PUDL ID. That’s because
  co-located fossil-fueled generators are considered parts of the same plant.
* **If the plant name looks similar but there are discrepancies:**
  such as different operators (e.g. a facility `keystone` with operators `baltimore
  gas and electric` and `atlantic gas and electric`), then it’s best to look at the
  capacity first to see if the facilities are the same. If that’s indeterminate, you can
  Google the plant to see if it has the same location or if there is ownership or
  construction history that helps determine if the facilities are the same or
  co-located. Once you’ve run the ETL, you can also look at the PUDL
  `plants_eia860` and `plants_all_ferc1` tables to compare the records’
  location information.

### Mapping Utilities

Both FERC and EIA have utility IDs, so we’re fairly confident that they don’t require
intra-dataset mapping. For this reason, we only focus on connecting utilities between
datasets.

#### Linking FERC1-EIA Records

#### NOTE
The following section needs to be updated to include new steps for mapping FERC1
XBRL utilities with DBF utilities.

Copy the information output to the `missing_utility_id_in_utilities_eia/ferc1.csv`
files and paste it in the appropriate columns at the bottom of the
`utility_id_pudl.csv`  sheet. Note that FERC 1 utility information goes in the
left-hand columns and EIA utility information goes in the right-hand columns.

Next, you’ll have to manually assign `utility_id_pudl` values to each row. There is no
formula you can drag down, so just find the largest `utility_id_pudl` and create new
values incrementing from there.

Next, run the auto-matching script to automatically match utilities with identical
names (after some light cleaning to remove variations in Inc. vs Incorporated, etc.).
To test this match without overwriting the existing matching spreadsheet, run:

```console
$ pixi run auto_match_utilities --test-run
```

The console will output information about the number of matches made, which utilities
are mapped to more than one ID, and which warrant additional manual review. Once you
are satisfied with the proposed changes, run:

```console
$ pixi run auto_match_utilities
```

Make sure to save the file when you’re done!

## Testing Newly Mapped Records

Before you integrate these newly mapped records into the PUDL database, you’ll want to
run some basic tests in the command line to make sure you’ve covered all of the unmapped
entities. This command assumes that you have all of the new EIA data loaded into your
live PUDL DB, and all of the new FERC 1 data loaded into your cloned FERC 1 DB:

```console
$ pixi run pytest --live-pudl-output tests/integration/glue/glue_test.py
```

## Integrating Newly Mapped Records into PUDL

Once you’ve successfully mapped all unmapped PUDL IDs, you’ll want to rerun the ETL!
This ensures that the newly mapped IDs get integrated into the PUDL database and output
tables that folks are using. Make sure to tell everyone else to do so as well so that
you can all use the newly mapped PUDL IDs. But first, make sure to head back to the
[Existing Data Updates](existing_data_updates.md) page to wrap up the validation tests!